Rail Recovery

A very bad picture from today, but it does sort of show what we have achieved. All the remain track fastenings from Donkey Gully Rd to Guildford have now been collected and stockpiled at convenient locations.

But that wasn’t all, we’ve even prepared Fryers Rd crossing for rail towing, a ramp has been installed on the south side and a dip in the track just on a bit has been patched up, ready to start towing rail down to Steven St. tomorrow from 8.15am.