Buffer Stop

Thursday’s gang set about repairing the extremely worn out buffer stop in the Muckleford Dock Road.

It’s been getting progress worse for years and was certainly a low grade piece of timber when first installed so it’s done alright, however with the wagons removed from the previous weekend’s activities, it was a great opportunity to do a few jobs in the seldom used dock road.

The new beam is the beam we rejected from Muckleford Creek earlier in the year. It had terrible ends but a marvellous centre, perfect for this application.

Once trimmed and centred the bolts were fitted.

A quick rub back of the old white paint and the whole thing was hit with an undercoat and two top coats of white paint. We used an airless sprayer and can highly recommend them! Even this cheapo one did a sensational job on this structure.

After the undercoat it did look a bit patchy, however still a great improvement on before.

While the paint was drying, we got back to fitting up the dock road point lever, now armed with the correct rod, it went together well.

While the dock road was empty, a bit of a general squeeze was undertaken to remove some crossfall, not a major thing but a good opportunity while in the area.

A bit of tidying up of the ballast was also undertaken.

For a simple buffer stop in a very quiet country dock platform, it’ll do the part for many decades to come.

The afternoon was spent removing gum tree saplings around Muckleford Yard out to Muckleford Creek Bridge, ahead of the lineside mowing it’s much easier to remove these, before they get another season of growth behind them.

This coming week will be exclusively lineside mowing, using a combination of the flail mower on the excavator and whipper snippers wherever we can’t get with the mower. We’ll be starting at Maldon ever day at 8am and heading out as appropriate – the locations will vary so meeting at Maldon and travelling out by rail is recommended.