Ballast plough

Although not today’s activity (a very quiet day with only odd jobs tended to between showers) we have now taken delivery of a ballast plough.

Wednesday saw a local tilt tray collect the 4 wheeled ballast plough from Daylesford for it’s short journey to Maldon.

The wagon was used on the VGR back during the Castlemaine extension project many years ago, with us now borrowing it again to spread ballast the full length of our line as part of the track upgrade.

We’re greatly thankful to our friends at the Daylesford Spa Country Railway for loaning us the wagon, it’ll make our life much easier!

It’s going to receive a bit of an overhaul before we put it to use.

Next week is shaping up to be a big week, with the installation of our new turnout planned, plus slewing the turntable track into it’s required location.

Muckleford Creek Bridge

It’s been a few days worth of work, but today saw that culminate in a very straight and very level track over the notoriously wiggly Muckleford Creek Bridge.

Some sections were straightened with brute force (the digger) while others were cross bored to correct slight gauge defects.

A lot of lifting and tamping across the bridge was also undertaken, removing the last of the dips due to decking holes that have now been plated.

Once we’d decided we had achieved an excellent job over the bridge, we turned our attention to the rough curve at the UP end of the bridge.

Lots of tweaking, with parts of the curve moved up to a 300mm to make it aline nicely with the bridge.

We even ran out enough ballast to fill all the voids over the bridge and re-establish a ballast shoulder where the curve was moved. The end result is a very nice looking piece of track.

Tomorrow will be a few odd jobs around the railway depending on the rain, meeting Maldon at 8am.

Civil Saturday

A very successful Civil Saturday on the 2nd November, with a record number of attendees!

image21

While the rain teemed down outside, attention was turned to the very overdue task of lubricating the interlocking (the bit that actually does the magic and ensures non-conflicting operations) in the Signalbox. Here Ian methodically lubricates the entire interlocking thoroughly.

image11

The interlocking (series of troughs, bars and locks) runs the full length of the levers and although we don’t use all the levers, there are components of the interlocking that still run the full length. Therefore it is important to ensure everything gets lubricated.

The troughs are all covered by plates, which are accessed from the mezzanine level, seldom used except for this task. The plates were taken off to allow the lubrication and returned promptly to prevent foreign matter gumming up the works.

image14

The all important lunch ceremony (not just restricted to the weekday gangs!). Norm (with his back to the camera), Julie, Stuart (hidden behind a lever), Rolf, Graeme, Trevor, Ian (just his had this time) and Steve (picture taker) joined in the team for Saturday’s efforts.

image18

After lunch and after the worst of the rain had passed, the gang moved to cleaning up the old compound up the north end of the yard.

image17

The fence was taken down to improve access to the various hidden treasures (or rubbish) within the overgrowth. This compound now serves no purpose, with it just getting in the way as we progress with construction works.

image18image13

The chain mesh was even nicely rolled into bundles! The various items hidden within the grass included; fish plates, junction plates, point levers, steel sleepers and lots of scrap! Its nice to be able to finally attend to some of these eyesores around the railway. The items are now sorted into their types ready for transport to more appropriate homes.

Rolf even found the time somehow to repair the landing timbers on one of the signal masts – an important job to ensure safe access when lubricating the signal arms.

image12

Sunday saw a small crew grab the fire fighting unit and burn a stockpile of scrap timber that had built up in the compound over the years. A big improvement!

Check back soon for details of the next Civil Saturday!

 

Castlemaine

Well today saw trench back filling and the completion of the new turnout in Castlemaine.

Plenty more trench filling required once all the services are in, which will be over the next few weeks.

The new turnout is planned to go in in a fortnight, once the site is levelled and cleared ready for track slewing.

Next week will be the final tweaking of the track over Muckleford Creek Bridge.

We’ll tend to these very minor discrepancies and correct the slight under gauge issue (that’s been there for 30 years!)