Today’s works train was about collecting all the remaining bundled timber sleepers from the Castlemaine section and transferring them to their homes along the Maldon Section.
Considering we can logistically only fit about 4 packs on a truck, a train is a very sensible way to move the 30 packs that needed moving.
We’ve still got about 200 sleepers yet to bundled up which weren’t collected, however will need all these and probably more to get through to Maldon.
The afternoon was spent marking those needing replacement and then distributing them alongside ready for more replacements next week.
We’ll be out near pipeline crossing on Tuesday, continuing onwards towards Maldon. Meeting 8am at Maldon.