Another successful day today, with another 70 odd timber sleepers installed into curve 15 and tangent 15-16.
As we’re recycling the removed sleepers from the concrete sleepering program, we need to avoid old holes, hence when installing the sleeper plates, drilling locations are marked.
A busy scene, with the spike removal gear being loaded back onto the truck, while Rolf tends to a sticking chuck in one of the drills.
And of course the obligatory lunch shot.
The cooler weather is much more welcome, with tomorrow forecast to be much the same, feel free to join us from 8am at Maldon or 8.15am from Donkey Farm Trk.