Newport

We’re down playing Turntables at Newport. A job we’ve not done a lot of, but it’s essentially bridge work which is a task we can handle with great ease.

The end timbers, where the locking mechanism sits are less than ideal, so we’re replacing them.

After a very late start and some minor truck trouble, we have done all the unbolting and even removed one timber. We’ll use this as the guide for preparing the new timber tomorrow and hopefully (if the rain holds off) get one if not both installed.

Meeting Newport from 8.15am.