The past few days we’ve been back into trenching at Castlemaine.
About 3/4 of the way down the carriage shed is as far as we could go for now, without moving the track. Eventually it’ll go another 100m-ish along the full carriage shed (once built).
Conduits for electricity and NBN are now in, with the plumbing going in tomorrow, ready for backfilling before the heavy rails predicted this weekend.
Tomorrow the gang will be at Muckleford Creek Bridge tending to more lining and decking repairs.
Meet Maldon 8am or site from 8.30am.