To stand on Sawmill Rd and look either way, it’s just concrete sleepers as far as the eye can see.
Just 400 have been spaced out along the track, ready to have their pads installed first thing tomorrow, before being placed aside ready to go in.
This would have happen sooner, but it’s been difficult to get a train free Monday / Tuesday for some time, so we grabbed the opportunity.
If nothing else it looks impressive.
You’re welcome to join us tomorrow, Maldon 8am or site from 8.45am