Trenching – filled!

Well three long days of back filling, our enormous trench is no longer.

With all but the small hole in front of the digger now filled and smoothed, it will of course all sink and require topping up after some rain.

Unfortunately this doesn’t quite mean the end of the trenching works, as there is about half as much still to go in the south direction, but it’ll be much easier with far fewer obstacles in the way. That will still be a few weeks away.

Tomorrow’s gang will be begging the final re-railing in the Maldon – Muckleford section. Please come along and help us celebrate this enormous milestone. Maldon 8am or site from 8.15am.