It’s done! After another stunning day’s work, we felt very proud. We’ve now got 80lb rail from Muckleford yard, all the way to the end of curve 20 with no bits of 60lb at all! Only the long straight to go in this half of the line.

We got into an excellent swing early this morning and despite it warming up a bit, we managed to keep up an excellent pace, with all 12 rails completely installed before 2pm.

We had to cut a shortish closure rail to join up with the crossing, but had a left over odd length perfect for the job.

We got into a great system today, for some reason it seemed even better than usual, but we did actually have a few extra hands.

Some final lifting to remove the dip off the crossing (built in on purpose when the crossing was rebuilt and joined to the 60lb) was the only major task for the afternoon. It looks excellent now, a really impressive piece of track.

We even found the time to sort all the old jewellery from this straight into drums or onto pallets, which means final cleanup will be a breeze.

Tomorrow is a get ready day for the big big week next week, 8am at Maldon.

We’re replacing almost 200 sleepers between Rowe St and Castlemaine Station all of next week, so any extra hands would be greatly appreciated. From 7am till we decide its too hot each day.

A very hot day…

With a top of 42 degrees predicted, we were out and about even before the sun was this morning, a quick pic of the sunrise grabbed on the way to site.

This is what faced our small team of 3 this morning, ballast scraping and tamping.

And in time we ended up with this! Thankfully the digger does 99% of the work, which in the heat is pretty much a necessity. We were going so well that my 9am we’d scraped up rock for tamping, tamped the whole section and removed any dips and twists, regulated the ballast to a nice finish and even dropped out the left over concrete sleepers to the next part of the job!

We’re back into re-railing next week, with much better weather predicted!

Concrete Sleepers

After a well deserved summer break the civil gang is back. We had planned on re-railing this week but with the ridiculously hot weather we chose a much more appropriate task.

Another 41 concrete sleepers were installed into curve 10. It was all done in the usual fashion, with one exception. A tamp of the sleepers was undertaken prior to clipping up, which greatly improved things. Normally with large gangs we’re actually looking for jobs for people, so a few extras on bars in helpful, but for today’s crew of 6 the tamping up was a life saver.

It couldn’t be said we were really in the shade today, but it wasn’t as bad as being in the full sun.

We’ve got the operation quite slick now, with all 41 sleepers installed by around 3pm, very good going for a hot day.

The small gang clinging to any shade available, we even had Wes, a visitor all the way from Queensland!

With tomorrow’s extreme weather warning for heat and fire danger, we won’t be doing any new works. We’ll be on site from 6.30am for ballast regulating and tamping, hopefully off site by morning tea. You’re welcome to join but please don’t make the trip if travelling a long way.

The week that was…

It’s been a rather busy week, with things seeming to be happening all over the railway. This a recap of all the activites over the past week, the final week on the track gang for 2018.

It would appear that our use of K class on a works train some months ago left the J class feeling left out, as this time when we requested a loco for a works train, it was sent out to the job!

It was mainly due to the diesel being in the workshops receiving a new paint job, however the opportunity was taken to undertake some training and assessment of loco crews, so a win win all around.

It’s purpose was to drop out rail near the Bendigo Road Level crossing ready for next year’s re-railing program.

All the required jewellery was also dropped out, it seems like a mountain of stuff, but we’ll likely need to get more yet to complete the job.

We’ve got a good work party planned for the week starting the 14th Jan, we’re actually hoping to be in at Castlemaine replacing sleepers next to the main line, but should we run into trouble this will be out contingency.

The day was also the first use of the QR wagon on a works train, used to transport out the dog spikes and sleeper plates. Here Will, sitting comfortably in his lunch chair!, is calling back the engine onto the wagons (it was sent away during lunch for re-fuelling).

Another pleasant first, we can’t actually remember ever using the J on a true works train before… We probably have but we decided if we can’t remember then this counts as a first!

Thursday’s gang was then tasked with the job of distributing the jewellery. But after a quick glance at the digger’s fuel gauge, we decided some more was needed. It’s got a fantastic fuel filler pump arrangement, perfect for sucking out of 200l drums.

First off bolts were dropped out, followed by Clive dropping out fish plates.

Next off was sleeper plates, this time we spent a bit more time positioning each precisely on the end of each sleeper and facing the correct way. Clive, Malcolm and Bruce got very proficient at this after 4 pallets worth.

Spikes were also dropped out, again with more precision than usual, right at the end of the sleepers, to hopefully avoid the need for double handling that can slow things down a bit.

Some odd jobs around Maldon a bit of a Christmas breakup filled in the afternoon.

Today’s small crew of 3 took on the task of trying to tackle our ever growing mess at Maldon. A recent donation of pallets makes the job much easier.

We don’t appear to have made massive in roads, but we have managed to sort most of the loose items into containers and have cleared room to start organising the pallets, drums and other bits into logical rows with some system.

There’s a lot to go, but once the genuine scrap is removed to free up valuable space, the area will actually look quite respectable. We also found all sorts of things we had no idea we had. One goal for 2019 will be to organise the stock piles, as this has caused some down time this year (trying to find those bolts or that plate…).

The week was finished with a final track patrol. And we are pleased to report that not a single new fault was found! A true tribute to all those who have helped out on the gang this year. We can’t thank you enough.