Mowing, it was just a massive day of limeside slashing with the flail, with the little digger on hand to move all the items that have got in the way of the mowing over the past few years.

The trolley to go behind the excavator received a thorough workout today, with many loads transported away from the lineside around Castlemaine to much more appropriate homes. These drums did a long trip to Muckleford while many other items, such as sleepers, were condensed in single piles rather than multiple smatterings.
The grass mowing is progressing very well, with hopefully only two more days needed to knock it over. Therefore, we will be able to hold a workday on Thursday for anyone interested. It’ll be at Castlemaine Depot, jacking and tamping the loco shed track, meeting there from 8.30am.