Another very successful day, with another lot of rails successfully dragged over Moscript St. Now almost filling the gap between the Junction and Moscript St.
Next week we’ll begin preparing rails for loading onto the train ready to be taken out to where they’ll be needed.
Tomorrow however, we’ll be starting at Stephen St. Dragging over what we can, however there’s only half a day’s work there, so hopefully after lunch we’ll be back into sledding. Meeting Stephen St. from 8.15am.