Certainly not a record setter day, but we still managed to get a good few hundred sleepers distributed out beside the track today.



The main dropout locations were by the 87 mile post, in whatever space was available between the cuttings to stockpile the sleepers.


Once the first load was out, it was back to Maldon to collect the small stockpile that had accumulated there, it wasn’t a full load, but still enough to warrant doing.


We even managed a third partial load, with the wagons a little over 1/2 loaded at Muckleford and distributed before parking the wagons up at Maldon for the Christmas period, there isn’t a great number more concretes expected over the next while, however there’s a few other items that’ll be nice to get out of Maldon while there is a few empty wagons available.
Inkeeping with the recent tradition, the digger held us up for half hour or so today, while we rotated a couple of tyres to better place a punctured one for the trip back home from Muckleford, in all fairness we’ve probably got around 3 years longer than we should have out of that tyre! It still has a transmission issue, but it appears to be improving somewhat, meaning the machine is still usable in non critical work. However, we’ll get back onto that issue in the new year.
No workday tomorrow, that’s more than enough work for this year!
A massive thankyou to everyone for another fantastic and extremely productive year, wishing everyone a very Merry Christmas and Happy New Year.
Looking forward to catching up again in the new year, with workdays starting back from Thursday 4th January.