Maldon Yard

We had a change of pace day today, renewing the derail blocks in Maldon Yard and lifting a Turnout which had settled a little in this big wet.

All three scotch blocks (2, 3 & 4 rds) were renewed with all steel derails, mainly to help reduce ongoing maintenance required, instead of being specially crafted blocks that are individually fitted in each case, these are an off the shelf item that requires nothing any more complex than screwing or spiking to the sleepers.

As part of the job, the supporting sleepers in 2 and 3 roads were renewed also.

The turnout at the UP end of Maldon Yard had settled a little at the toe, likely due to the ground getting wet for the first time in many decades. Unfortunately to tamp it up properly requires the removal of a good number of rods and bars, so it’s quite a time consuming task, however one that’s now completed.

While there, we set about ensuring all bolts were tight and every moving part was moving with ease and adequately lubricated, we were pleasantly surprised at how easily the pins came out of the rods, indicating the lubrication which is applied regularly is effective in both lubricating and preventing corrosion.

Check back tomorrow for details of Thursday’s works, as we’re slightly dependant of a number of pieces of equipment being available and working that currently need a little TLC, hopefully achievable tomorrow.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s