We’ve been out and about again, this time re-sleepering over at the Ballarat Tramway Museum.
The sleepers replaced were concentrated around 6 & 7 roads outside the shed, with a few spot replacements around the yard.
The pics show the work as it progressed.
There was also some tamping, lifting and levelling around the depot to remove a few dips.