Just a quick one today showing our next location for re-railing with 80lb rail.
The curve between Muckleford Creek Bridge and Donkey Farm Track. Previously the high leg had been re-railed with this work on the low leg.
All rails, bolts, spikes, sleeper and fish plates were placed out on site today, with job completion expected by Friday Afternoon.