Concrete Sleepers

We’ve had a busy week so far this week, with 240 concrete sleepers inserted.

We’re now past the whistle post, meaning we’re less than 440 yards or approx 400m to Donkey Farm Track. Shouldn’t be too long now.

It seems very achievable by the end of July now.

Unfortunately, tomorrow is a bit of urgent bridge work at Winters Flat, following a road vehicle collision with the Bridge this morning. The initial inspection has shown that the damage is limited to movement of the beams and decking, as well as some extra damage to the sign.

We’ll be meeting at Maldon at 8am then out at Winters Flat from 8.45/9am – we’ll need a few drivers at Maldon tomorrow so please start there is possible to ensure we can get all the gear out to site.