Tuesday’s are often our preparation day, however we got such a good headstart on Friday, we were ready to actually make a start on the job today.
In addition to doing more preparation and a few odd jobs at Maldon this morning, we’ve installed 60 concrete sleepers today, taking the minimum additional insertions this week down to 160, so very achievable.


We’re yet to give it a final lift. However, we’ve tweaked it enough to run over very safely tomorrow. By some weird fluke, our really temporary ramp back to timber is one of the best we’ve ever made… and it will only last one day.
Thursday and Friday we’ll be back out here, getting over the rise and as far down the other side as we can, we’re determined to remove all the timber in this section before the end of the year.