Sawmill Road

The last movement over the old Sawmill Road Crossing this afternoon.

And once the train was out of the way, it was into destruction mode – we’re good at that bit. We’ve lifted the rails on the UP side of the crossing, and got those on the Down side holding on by just one bolt to allow easy digger access in the morning, then we’ll be ripping it all up!

We’ll be on site from 7am in the morning. However, the man power will be really needed after lunch, so please feel free to have a bit of a later start. Parking, if possible, please keep well away from the crossing to keep our machinery and access. There is plenty of room down by the Bridge, and it’s only a short stroll.