A very good start to the week, with 80 sleepers installed and clipped up into Curve 17, this is at the 1 in 4 spacing, aiming for a total of 320 this week.


It was all done in the usual manner, it’s become quite a well rehearsed pattern now.


We’ve made a good start on knocking off the remaining timber sleepers, however that’ll be first cab off the rank tomorrow.
Meeting at Maldon 8am or on site from 8.15am (site is now approx 500m on the Down Side of Pipeline Crossing).