Today became an odd job day, however probably one of the most successful and productive days of this type we’ve had in a long time!
The list of jobs knock over included
– finishing off the 2nd spike puller assembly
– building a second timber sleeper bundling cradle
– getting the flashing light remote box back up and working in the gang truck
– tightening up the jaws on the big digger grabs
– getting the 2 way radio working in the Hyundai and working out what’s needed to get the takeuchi similarly equipped
– a new crane hook was fitted to the yellow crane truck and the old one was cascaded to a spike puller
– lots and lots of small little jobs were knocked over in addition to the above, things we just haven’t had the time to get to until now

We’re pretty much ready to rock and roll with great efficiency into the resleepeering, just the little bridge jobs to tick off next week, and we’ll be ready.
There will be a blog post with details of next week’s work on Monday.