We’d had a successful week so far, a further few hundred concrete sleepers have been dropped off trackside and distributed.
We’ve now got the little digger back on action and from tomorrow we’ll be back into replacing failed timber sleepers near Rifle Range Bridge.
There isn’t a great need to meet at Maldon, so if we meet out at Rifle Range Bridge from 8.30am we should hopefully get a hundred or so sleepers in tomorrow.
