Sleepers

Sleepers today, in between showers. All in the usual way, albeit quite slow through the cutting due to the limited space available.

We’ve managed to install and clip up 101 sleepers, with a further installed but not clipped up, as we ran out of biscuits. This has taken us down to the curve, meaning the long straight is now re-sleepered! Still lots of tamping to go however.

Thursday’s crew will be continuing with this task, working around the track weedspray, all going well with the weather. Meeting at Maldon at 7.45am or out at Boundary Trk from 8.15am.