The earthworks have started for the installation of no. 5 siding through the carriage shed.
Keep a look out for details of upcoming workdays for the laying of 5 siding.
The earthworks have started for the installation of no. 5 siding through the carriage shed.
Keep a look out for details of upcoming workdays for the laying of 5 siding.
Last week saw us back in Maldon yard replacing a few more point timbers.
Our attention this week was on the 1 to 2 Rd down end turnout. It was an awkward location to work in so progress wasn’t as rapid as the rest of the yard but we still did very well.
We were back at it today putting in new turnout timbers in Maldon Yard.
3 / 4 road turnout with its new timbers under the blades.
We've almost finished the UP end of the yard, with only a couple to still go in the dock road turnout.
The following pics show the works at the down end of the yard.